Close to home and newly built: Concrete station ready for connection at Madfeld wind farm
Compensation system for the provision of reactive power to comply with the technical grid connection rules (TAR) in accordance with the standards.Connected load: 31.5 kV,Compensation line: 5.3 MVar,area of concrete station: 8.5 m x 3.4 mSpecial feature: Medium voltage switchgear incl. ring cable field for connection of the wind farm